Libya Modular Flat Pack Container House Camp kwi-Oil Field

Kubandakanya: Ikhitshi kunye neCanteen, Indawo yoLonwabo yokugcina ebandayo, Indawo yokuhlala yoLawulo, indawo yokuhlala yabasebenzi, indawo yokuhlamba impahla, indawo yokugcina impahla.

Iqulathe 44 isikhongozeli esisicaba sendlu kunye nendawo yokugcina ebandayo

Ixesha lokuvelisa: iintsuku ze-30

Ixesha lezothutho ukusuka eQingdao Port: 50days

Ixesha lokufakela: 20days, 12 labour.

Le projekthi ibekwe eLibya, kubandakanywa iiseti ze-44 zendlu yokupakisha i-flat pack kunye ne-1 iseti yokugcina ebandayo, equka: Ikhitshi & I-Canteen, i-Cold Storage Recreation, i-Accommodation yoLawulo, i-Accommodation yabasebenzi, i-Laundry, i-Storeji.
Umzi-mveliso weLida Group wagqiba ukuveliswa kwayo yonke indlu yeekhonteyina ngaphakathi kweentsuku ezingama-30, kwaye zonke iikhonteyina zafika kwindawo ngoJuni ka-2022 emva kokuhamba elwandle ngaphezulu kwenyanga enye.
Emva kokufika eLibya, iLida Group ibonelele ngenkxaso yobugcisa kunye nomphathi wofakelo olucwangcisiweyo.Le nkampu yagqitywa kwiintsuku ezingama-20.
   
Indawo yeProjekthi: eLibya
Iimveliso ezisetyenzisiweyo: I-Flat Pack Container House
Ummandla: 2,000 square metres

Malunga noLida

Iqela le-Lida lasekwa ngo-1993, njengomvelisi oqeqeshiweyo kunye nomthengisi ngaphandle ojongene noyilo, imveliso, ukufakwa, kunye nokuthengiswa kolwakhiwo lobunjineli.

Iqela le-Lida liphumelele i-ISO9001, i-ISO14001, i-ISO45001, isiqinisekiso se-EU CE (EN1090) kwaye iphumelele i-SGS, i-TUV, kunye nokuhlolwa kwe-BV.IQela leLida lifumene iSiqinisekiso seSibini soDidi lweSityebi soBuchule boBuchule beNkontraka yoLwakhiwo kunye neSiqinisekiso seKhontrakthi Jikelele soBunjineli boKwakha.

 

Iqela leLida lelinye lawona mashishini anamandla adityanisiweyo obunjineli eTshayina.Iqela leLida liye laba lilungu lemibutho emininzi efana neChina Steel Structure Association, iKhansile yaseChina yokuKhuthaza uRhwebo lwamazwe ngamazwe kunye neChina Building Metal Structure Association, njl.

 

Iimveliso eziphambili zeLida Group ziqulethe ubukhulu obukhuluinkampu yabasebenzi,Izakhiwo zesakhiwo sentsimbi, LGS Villa, Container house, Prefab house, kunye nezinye izakhiwo ezidibeneyo.Ukuza kuthi ga ngoku, iimveliso zethu zithunyelwe kumazwe angaphezu kwe-145 kunye nemimandla.


Ixesha lokuposa: Apr-26-2023